Maintenance Manual Of Rare Earth Permanent Magnet Generator
1. Introduction 1.1 Appearance: 1.2 Inspection test: Check if there are external damages when you receive the goods. Check all the data on the nameplate. Spin the shaft by hand, and check the no-load running. 1.3 Insulation test: The windings of the PMG may get damp before the first time use. It is necessary to test the Insulation […]